Skip to Content
author's profile photo Former Member
Former Member

How to assign a alternative date from an EC to a BOM

Hi, all

I've found a FM called "CCAP_ASSIGN_OBJECT_TO_ALT_DATE" through the link: [http://help.sap.com/saphelp_40b/helpdata/en/92/58b4e8417011d189ec0000e81ddfac/content.htm]

but I have no clue how to use it.

Could anyone offer me a example?

thanks in advance

Edited by: chan Jay on Dec 13, 2011 3:08 AM

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Dec 13, 2011 at 04:33 AM

    hi chan,

    it is used for assinging alternate date for an object which has been created....jst call that function module...giv alt date ,change object num,& object type...object type have some categories like material see according to your requirement

    thanks

    chaitanya

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 13, 2011 at 05:21 AM

    Hi, I already found it out. Here is the result. Share with you all.

    [http://jaysadventure.blogspot.com/2011/12/ccapassignobjecttoaltdate.html]

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.