Former Member
Dec 12, 2011 at 06:54 PM

SAP Records Locking for preceeding documents in MM

49 Views

*Hi Experts,*

Our client have a current requirement. They want that all the preceding documents to be locked once the subsequent documents are converted and posted. Eg- when PR converted to PO, PR to be locked or disable, PO converted to MIGO, PO to be locked, After MIRO, MIGO locked or no reversal or cancellation of MIGO document.

I tried to disable the PR by screen layout assign to release status. Then set the GR based I V to avoid reversal og MIGO, but this to be in a flow. Can you please guide me in some enhancement needed in this or any standard BADI exist or help me in getting the logic for this functionality.

Thanks.