Hi ALL

I done FI -MM Integration,

At the PR me51n getting error

error message

Deliv. date outside period covered by factory calendar 01

Message no. ME078

plz give reply ASAP

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

3 Answers

  • Posted on Dec 12, 2011 at 05:13 PM

    Check factory calender at transaction code SCAL

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 13, 2011 at 06:10 AM

    HI

    Asper ur requiremnt u have to go change the ob52 their date for regrading vendor as per ur finanical yr then posted the transaction then it should be posted the trasaction.

    REGRADS

    NASERK

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 13, 2011 at 06:28 AM

    Hi,

    GO TO ...................... IMG > GENERAL SETTINGS MAINTAIN FACT. CALENDER or use t.code SCAL or OY05. There you CLICK ON CREATE (THE BLANK PAPER ICON ) select factory calendor and also select the other options as per the requirement and save it.

    I think this will surely help you.

    Thanks

    Urmila S.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.