cancel
Showing results for 
Search instead for 
Did you mean: 

OM PA integration

Former Member
0 Kudos

Changing Org. Unit or position texts On OM, It would not reflect on IT 0001 automatically and RHINT30 needed to run to correct the IT 0001 PA record.

The problem with RHINT30 is that effective start date of the OM change needs to be provided before running the report for the report to be able to pick up the mismatch OM-PA text records. So it is not possible to run the program in a daily batch to pick up all the changes made to the Org. Str. Regardless of the start date of the change.

Do you know any work around solutions to be able to run the report without entering the effective start date and it pick up all the changes made on daily bases?

Thanks

Hamza

Accepted Solutions (0)

Answers (1)

Answers (1)

christine_morin
Employee
Employee
0 Kudos

Dear Hamza,

Please note the following points regarding the start date of the infotype record update and the validity period of the record from the Personnel Planning perspective.

Case 1:

Start and end date of the validity period are after the date entered. In this case, a record is created in PA with the same validity period. There are no changes made on the Personnel Planning side.

Case 2:

The start date of the validity period lies before the start date entered, and the end date is after it. In this case, a record is created in PA with a start date the same as the start date entered. The end date of the record is taken over. On the PD side, the original record is split at the start date entered.

Case 3:

Both the start and end date of the validity period are before the start date entered. In this case, no editing is carried out by the report.

Please make sure that you have the parameter PLOGI SPLIT set to 'X' in T77S0 table. Hope it helps,

Kind Regards

Christine