Skip to Content
0
Former Member
Dec 12, 2011 at 11:49 AM

REG Material Type for a Material

19 Views

Hi All ,

I have Mapped a wrong material Type for a Production material.A Production order has been created for that Material and stock has also been issued and Work Order has been closed.Bu even then Im unable to change the Material Type of the material.Is there any way to change the same.

Regards,

PradeepM.