Skip to Content

How to transport process chains from dev to quality ?

I have developed few ip s ,dtp s , transf etc for few iobj. Few are available and few are not in Q. I know if all are available how to move a pc but in this case, what is the best approach to move all the respective objects related to that pc into Q.

I mean do i have to manually verify what is available in Q and then move the missing dtp,ip,tran etc first ...and then move the pc or..... I can just send the respective dtp,ip ,tran etc while transporting the PC. That is my doubt.

I have many objects (dtp,ip,trans)and almost 20 pc need to be moved to Q 😔 .Experts, Please suggest the best approach.

Thanks,

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 12, 2011 at 08:24 AM

    Hi Daniel ,

    Best is you transport it from transport connection (RSA1) .

    Change the display to List and select all elemnts you want to transport .

    As we can directly create process chain in Q and P system so usually we don't transport but if you have to then you need to capture all objects of process chain .

    ex: All process variants,Program variants ,If new DTP or Info package you have that is not having same tech name as in Q and P .If you have any report program that is not in Q and P that will also get collected in TR .

    In short all objects that you are using in Process chain and not exist with same tech name in Q and P need to be moved .

    and also remember first the objects that a Process chain is using should move and then process chain .

    Regards,

    Jaya Tiwari

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Daniel Ray

      Hi Daniel ,

      I was telling you about objects that are part of process chain .

      ex: you have created a DTP or info package and added it in your process chain .

      When you will transport chain then if any DTP with same tech name will not exist in target system your transport will get failed .

      So you need to ensure that the object that your process chain referring either exist already in target system or moved before the transports of Process chain using them will move .

      Regards,

      Jaya Tiwari

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.