Shutdown Planning of PM through PS

HI

Kindly suggest me how to planing the shutdown of PM module through PS module. is there any configuration required for this.

Thanks inadvance.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 12, 2011 at 08:14 AM

    Hi,

    create revision and include in shut down order and also include WBS in equipment master for settlement and same would be populated in additional tab of maintenance order.

    Regards,

    Sudhakar

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi,

      See - I just told you only main config steps which are required for Turnaround Project.

      There may be other as well depending upon business needs...

      For example like All cost should booked into Maintenance then we may need to use WBS Element as Statistical and same thing needs to be configured into Project Profile by selecting Statistical Check Box.

      For one/two WBSE (Capex WBSE) we can remove this statistical check box by de-selecting manually.

      Main steps are:

      1. Project System -Structures Operative Structures -Work Breakdown Structure (WBS)--Create Project Profile

      2. Project System -Structures Operative Structures -Network -Settings for Networks --Maintain network types

      3. Project System -Structures Operative Structures Network -Settings for Networks---Specify Parameters for Network Type

      4. Project System -Structures Operative Structures -Network -Settings for Networks -Maintain network profiles

      5. Project System -Structures Operative Structures -Network---Define Parameters for Subnetworks

      6. Project System -Costs -Object Class Default Values---Specify Default for Project Definition Object Class

      7. Project System -Costs -Object Class Default Values---Specify Default for Network Header Object Class

      8. Project System -Costs-Automatic and Periodic Allocations Settlement-Specify Default Settlement Profile for Project Definition

      9. Project System-Costs-Automatic and Periodic Allocations Settlement Define Settlement Rule for Network-Specify Default Settlement Profiles for Networks

      10. Project System -Dates -Scheduling---Specify Parameters for Network Scheduling

      11. Project System -Resources -Maintain Control Parameters for the Availability Check

      12. Project System -Material -Availability Check--Define Checking Control

      13. Project System -Confirmation -Define Confirmation Parameters

      14. "Define Task List Usage Keys (0-Standard Network in Task List Usage 004)

      It is required to Use PM work Center in Network screen"

      15. "Factory calendar in project differs from plant factory calendar

      needs to be changed to W8"

      16. Project System > Structure > Operative structure > Network > Define Parameters for Sub Network

      17. Control Key

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.