Creating New WS

Is 16 hours of time estimation to create WS from scratch including user req gathering is high?

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Dec 09, 2011 at 01:59 PM

    Probably considering you have to tranpsort into a test system and finally into production system, unit test, and UAT, the total time elapsed will probably be about 16 hrs (two working days) actual time spent working on this may be lesser. Ofcourse it also depends on the number of Work Schedules you are going to create.

    Add a comment
    10|10000 characters needed characters exceeded

    • What I would normally do if I find something unusual that is against the documentation, (if I have lots of time that is), I would configure it without that field and test it - In this case, it would mean, creating a workschedule without the Sickness Indicator, assign it someone, give him some sick leave run time evaluation(if relevant) and payroll, and see whether it is impacting anything. If no impact is found we safely leave it out.

      In short - read documentation, get help from sdn but after all is done, test for yourself and confirm that what you have been told is correct..

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.