Skip to Content
author's profile photo Former Member
Former Member

separate planned order

Hi Gurus,

In my cycle I have 03 operation line.Each line have same output.

I want to put demand in md61 for each line & system should create separate planned order for separate.Material number for each line is same & raw material also.

Same plant.

Pls guide me how I should create BOM, routing & Md61

Thanks

XXX

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Dec 09, 2011 at 05:05 AM

    Dear

    See first of MRP will plan according to your master data and the availability of material so when u create a bom level by level at that time u need to make sure that these material having a significance of MRP and look whether these materials have maintained MRP 1234 in material master after that

    1. Create a BOM according to the process suppose for first operation u get one product say SFG A 2nd operation u Get SFG B

    so make BOM such a way that it should be linked with i mean level by level as per operation

    SFG B>>>> SFG A like SFG B under SFG A so on

    2. Then routing according to the Header u create routing SFG B >>>> SFG A and allocate the components

    3.Then save

    when u run MRP MD02 after giving the requirements for the header material MD61 u get the planned orders complete for all the materials but make sure the stock if stock is there it wont plan

    with regards

    pushpalas

    Add a comment
    10|10000 characters needed characters exceeded

    • Dear XXX,

      1.You can create 3 different production versions by linking the respective BOM and routing.

      2.Set the value - 4 in MRP2 view for the field quota arrangement for the header material.

      3.Maintain the quota for this product in T.Code MEQ1 by mentioning the % of split for each production version say for example

      33,33,34.(also ensure splittiang Quota check box in OMI4 is included for the lot size that's aaigned inthe material master of the

      product).

      4.Maintain the PIR's in MD61,run MRP and check the results.

      Regards

      Mangalraj.S

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.