Dear Experts,
We have an issue of Overhead calculation, the overhead calculated on cost element defined as base in costing sheet, can we calculate overhead on input material wise, suppose 6 material consumed in a production order I want to calculate overhead on only 4 material but the valuation class of all 6 input material are same.
kindly help to solve the issue,
Thanks & Rgards,