ABAP DUMP

Hi All

I have currently activated the following business function LOG_EAM_CI_3 (PM module continous inprovement)and EA-PLM (product life cycle management). After activation it gave ABAP dump LOAD_SWITCHSTATES_MISSMATCH. wHY Why is this dump coming. Please help in sorting it out

With Regards

Arun

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Posted on Dec 08, 2011 at 10:36 AM

    Hello,

    De-Activate the same & Activate once again .Then check

    Regards,

    Rakesh

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 12, 2011 at 03:31 AM

    Is LOAD_SWITCHSTATES_MISSMATCH dump during any transaction or scenario.?

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      During Switch Framework activation, you should avoid having users on the system or jobs running (quiet system)since programs are touched and need to be regenerated.

      This could be the reason for the dumps in productive system.

      Regards, Pascale

  • Posted on Jan 08, 2014 at 07:30 AM

    Arun,

    Can you post the dump log?

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.