PIR and Production Orders

Hi all,

X product's strategy is 40 and it has 20 production orders, seen in MD04. In MD61 i have entered 40 PIR. In MD04 i want to see that 20 production orders and 40 planned orders after MRP run. But MRP run creates 20 planned orders. It creates PIR with VSF. I tried strategies 50 VSE and 10 LSF but it has no effects. How can i plan as told above?

Regards,

techmaster

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Dec 08, 2011 at 05:04 PM

    Hi Techmaster

    What you have described seems to be the standard behavior for strategy 40. MRP will create planned orders to cover the PIR quantity minus firmed receipt elements.

    You would have to consider the existent production orders quantity when creating PIRs.

    BR

    Caetano

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 09, 2011 at 07:44 AM

    Dear Caetano,

    Is there any way to plan PIR without considering existing production orders ?

    Regards,

    techmaster

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.