Dear Expert,
now, i want to run snp plan for two location 1000 and 2000 with heuristic method.
at the difference point of time, i run difference snp plan. for example, this month i run snp with transportation lane from 1000
> 2000 for product A113 and A124. but in three next month i want to run snp with transportation lane from 2000
-> 1000 for A113, A124 and A224.
so i don't know how to config snp to do this. 'cause i know with two direction transportation lane the system will have a loop.
please help me.
thanks so much.