how to use snp heuristic with two direction transportation lanes?

Dear Expert,

now, i want to run snp plan for two location 1000 and 2000 with heuristic method.

at the difference point of time, i run difference snp plan. for example, this month i run snp with transportation lane from 1000 > 2000 for product A113 and A124. but in three next month i want to run snp with transportation lane from 2000 -> 1000 for A113, A124 and A224.

so i don't know how to config snp to do this. 'cause i know with two direction transportation lane the system will have a loop.

please help me.

thanks so much.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Dec 08, 2011 at 07:13 AM

    Hello,

    If you just use location heuristic, the system is OK with the cycles. You can just run it.

    Even if you use network heuristic, the heuristic can also run. The only problem is that the low level code may not be correctly determined, which cause the sequence of the locations incorrect.

    And you also have the following options:

    1)Block the unused the transportaion lane when you want to switch to the other way.

    2)Use BADI /SAPAPO/PWB_SOS method PWB_USEX_SOS to filter the unused transportation lane.

    Best Regards,

    Ada

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 13, 2011 at 01:33 PM

    Hi, is the answer from Ada clear to you? in the first week, run location heuristic at 2000, and in the next month, run location heuristic at 1000. Use product specific t-lanes to meet your requirements. It should not be an issue.

    PS: do not run Low level code determination if you create t-lanes in both directions, as the low level code determination will unneccessarily fail.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      If I Understand correctly you want to requirement to flow from 1001 to 2001 in a specific period and then from 2001 to 1001 in another period for same materials.

      If this is the case try working with the valid from and valid to dates in Transportation Lane so that system picks the appropriate lane during the respective periods

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.