Transporting PCo Setting Through Landscape

Hello,

We are using PCo 2.1 and MII 12.1. We have 3 instances of each for development, staging, and production.

In order to transport changes from one environment to another, I am using PCo's Export/Import capability. This works ok except that, after importing, I have to manually edit the Destination System's Server Name setting to change it to point to my staging MII host instead of my development MII host. I have the same issue going from staging to production.

I would like to avoid the manual editing. Is there a way around this?

Thanks,

Mike

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Dec 07, 2011 at 08:53 PM

    Did you try editing the xml with a careful search/replace? Aside from having DNS servers repointing the server names, I don't see a way around the explicit nature of the binding of server paths and ports.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 08, 2011 at 04:06 PM

    Mike,

    I belive you could just import the Agent by iteself. Instead of importing the source and destination everytime.

    Regards

    Ajay.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.