Hi Gurus,
I am trying o set an MRP, type PD with EX lot size then i save an independent requirement at MD61, run the MRP at MD02 for the finished product but the values on the planned order don't make any sense.
Example:
Storage stock = 5000 Kg
Independent requirement = 100000 Kg
Planned order = 110604 Kg
Shouldn't the planned order be the requirement minus the existing stock (95000 Kg) ?
Thanks in advance for you help.