Problem with MRP

Hi Gurus,

I am trying o set an MRP, type PD with EX lot size then i save an independent requirement at MD61, run the MRP at MD02 for the finished product but the values on the planned order don't make any sense.

Example:

Storage stock = 5000 Kg

Independent requirement = 100000 Kg

Planned order = 110604 Kg

Shouldn't the planned order be the requirement minus the existing stock (95000 Kg) ?

Thanks in advance for you help.

Kind Regards.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Dec 07, 2011 at 06:10 PM

    Hi,

    Your logic is right.

    But there may be some other requirements in the form of forecast/sale order.

    Therefore, please check in MD04 if any other requirement exists.

    Otherwise, please check if safety stock has been defined in MRP view of material master.

    If either of these exists, then MRP will consider these as requirements and add to the planned order.

    Regards

    Prabhu

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.