Skip to Content
author's profile photo Former Member
Former Member

Semifinished Product will produce in one plant and used for both plant

Hi Experts,

we have one requirement from client like physically semifinished product plastic cabin will be produce only in A2 plant for A1 and A2 Plants which are same company code (No Stock Transfer will take place).

In the SAP system, clients needs to show plastic cabin will be produced in both plants (A1 and A2 Plants) by using same workcenter. Both plant have manufacturing plant with 2 diffrent product which is used same plastic cabin.

I know there will be Costing Impact for workcenter. Can you guide us how to map this scenario.

Regards,

Dev

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Dec 07, 2011 at 04:47 PM

    Hi Dev,

    Why can't you try this by doing Scope of Planning

    Regards,

    Madhu.G

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Madhu,

      Can you tell how to use scope of planning. Because this plant have diffrent requirement for this cabin from product perspective.

      Also using same work center from plant A2 will be used for both plant production.

      Regrads,

      Dev

  • Posted on Dec 07, 2011 at 06:18 PM

    I don't know why you intent to maintain in SAP that it is produced in both plants when it is actually produced in one plant.

    Since you said the same component (plastic cabin) is used to make different other materials in different plants and there is only one producing plant, I would suggest you to look into the special procurement key option.

    You go to transaction code: S_ALR_87006492

    Create new entry: example Z1

    Plant #A1.

    Sp. Pr. Type Z1

    Enter your procurement type E.

    Under 'as BOM component' section, 'Withdrawal from an alternative plant' tick the checkbox and your Issuing plant as Plant # A2.

    After you assign this special procurement key to material in material master. The following scenario will occur.

    If stock is not available in plant A1 it will always create stock transfer requisition from plant A2 and if stock is not available in A2, mrp run in plant A2 will create a planned order.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.