Hi Experts,
we have one requirement from client like physically semifinished product plastic cabin will be produce only in A2 plant for A1 and A2 Plants which are same company code (No Stock Transfer will take place).
In the SAP system, clients needs to show plastic cabin will be produced in both plants (A1 and A2 Plants) by using same workcenter. Both plant have manufacturing plant with 2 diffrent product which is used same plastic cabin.
I know there will be Costing Impact for workcenter. Can you guide us how to map this scenario.
Regards,
Dev
I don't know why you intent to maintain in SAP that it is produced in both plants when it is actually produced in one plant.
Since you said the same component (plastic cabin) is used to make different other materials in different plants and there is only one producing plant, I would suggest you to look into the special procurement key option.
You go to transaction code: S_ALR_87006492
Create new entry: example Z1
Plant #A1.
Sp. Pr. Type Z1
Enter your procurement type E.
Under 'as BOM component' section, 'Withdrawal from an alternative plant' tick the checkbox and your Issuing plant as Plant # A2.
After you assign this special procurement key to material in material master. The following scenario will occur.
If stock is not available in plant A1 it will always create stock transfer requisition from plant A2 and if stock is not available in A2, mrp run in plant A2 will create a planned order.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Well I didn't know you're using APO for planning.
APO does not natively support the special procurement (SPK) for withdrawal from an alternative plant (At least until APO 4.1, the latest version might already have that BAdi and may support, if not you need to implement it). But there is a BAdi which can be implemented in APO which will support the SPK for withdrawal from alternative plant.
Here is the note how to implement it. It's pretty straight forward. [577158|https://service.sap.com/sap/support/notes/577158]
Related note about all the SPK's supported by APO [619976|https://service.sap.com/sap/support/notes/619976]
Hi Dev,
Why can't you try this by doing Scope of Planning
Regards,
Madhu.G
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
9 | |
9 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.