Hi Experts,
As per our client requirement we marked price control "S" for all materials. While running the Std costing, system is showing the Cost components as below
Direct Material 13.29$
Material Overheads 1.92$
Direct Labor 68.19$
Labor Overheads 79.78$
The Material overhead percentage rate is 16.9%.
Now the problem is with the Material cost 13.29$. In this cost the Material overhead cost also included. So please suggest what i need to change in the config part to get this component (Direct Material) without material overhead.
As per our requirement the values should be shown as below
Direct Material 11.37$
Material Overheads 1.92$
Direct Labor 68.19$
Labor Overheads 79.78$
Thanks&Regards,
Raja lucky.