Dec 07, 2011 at 09:57 AM

Prevent Costing if Routing status is nor released

127 Views

Is there a way to prevent costing of a material if it's routing hasn't released?

I noticed that I can cost a material even if the routing is just created (status 1), then the costing doesn't consider routing cost only BoM and other stuff.

thanks

g