Skip to Content
author's profile photo Former Member
Former Member

BPC 10 NW SP4 upgrade

Hi,

I upgraded a BPC 10 NW SP2 platform to SP4 and everything looks all right with SPAM transaction.

While connecting to BPC web, the flex client starts but freezes on the BPC splash windows.

I did the same operation on another platform (same config) and everything looks fine...

Any suggestion ?

Thank you,

Thomas

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Dec 07, 2011 at 02:04 PM

    Hello Thomas -

    This is a known issue that should be corrected by implementing Note 1647949 or migrating to SP05.

    Regards,

    Sheldon

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 07, 2011 at 02:34 PM

    Hi Sheldon,

    Thank you for your answer.

    Since I cannot already download SP5, how can I apply the note (I didn't see any instruction inside) ?

    Thank you,

    TC.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.