i have one scenario at stock transfer between the plants intra,one business maping is reqd at these below cases

1:Shortage: supplying plant send the stock 100qty thru transporter, in case of shotage 20qty transporter will be liable when transported in open container. else on closed container, supp plant will be responsible.

2.Excess: if the stock has getting excess from suppplant (differ from document ), how to map in sap as rejecting the stock or any further solution .

3.wrong material: if the suppplant send wrong material then how to map

4.Damage:if the stock getting as damage from suppplant.

these are all activites how to map at receiving plant.

Thanks & Regards,

Nar

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 05, 2011 at 04:46 PM

    Hi,

    1:Shortage: supplying plant send the stock 100qty thru transporter, in case of shotage 20qty transporter will be liable when

    transported in open container. else on closed container, supp plant will be responsible.

    I guess this has to be dealt with a custom (manual) condition.

    2.Excess: if the stock has getting excess from suppplant (differ from document ), how to map in sap as rejecting the stock or any further solution .

    This can be achieved thru setting over/under delivery tolerance. Anything excess set the message as error.

    3.wrong material: if the suppplant send wrong material then how to map

    This cannot happen as long as both plant share same master data. (which is usually the case)

    4.Damage:if the stock getting as damage from suppplant.

    This can be done in different ways:

    •_Reverse the removal from storage at the issuing plant and then post the scrapping of the material at the issuing plant._ In this case, the scrapping is posted on a value basis in the issuing plant.

    •Alternatively, place the full quantity of the goods into storage at the receiving plant and then post the scrapping at

    the receiving plant. The scrapping is then posted on a value basis at the receiving plant.

    Hope you find this useful.

    Reetesh

    Add a comment
    10|10000 characters needed characters exceeded

    • Dear Reetesh

      Thanks for your response.

      case2.Excess: stock send by suppplant 100qty in sap,but phsyically at receiving plant they get 110qty.in this situation

      how to map excess qty 10 in sap.(plz consider excise aslo).

      .3._wrong material: if the suppplant send wrong material then how to map__

      here in sap they have entered one material, physically they have send another material to receiving plant.

      how to overcome in sap those mismatches.

      Regards,

      Nar

      Edited by: sap2000k on Dec 8, 2011 2:30 PM

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.