capacity planning

Hi Gurus,

Can anyone tell me the step by step procedure for capacity planning its pre requisits and the tcodes related to capacity levelling and evaluation in detail..

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Dec 06, 2011 at 07:15 PM

    Hi Preeya,

    Well Capacity planning will be used in Production planning to reduce the load in Work Center.

    It means say in one you have 100 orders to manufacture but the capacity to do the job is less then, but you have to deliver it to the customer in time so at this point of time we will use the capacity planning.

    Capacity Evaluation: (CM01)

    Load on the work center

    Order for that load

    (Here we can check the load)

    Capacity Leveling: (CM21) Graphical method

    If there is overload we can be bring down.

    (Here we can adjust the orders by the available dates OK )

    Capacity Leveling: (CM22) dates tabular method

    (Here we can adjust the dates in tabular way OK)

    Any questions please ping me again.

    Regards,

    Madhu.G

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.