Hi,
I'm trying to understand why some materials show up in error in the report following our MPS/MRP run through MD40. I have a number of materials that are permanently stopped (both X-plant and plant specific material status), that aren't in any BOM, but nevertheless show up in error (exception 8) in the report.
Could you help me understanding:
- how can I further investigate the output of this report so I can understand what goes wrong?
- what exactly determines whether or not a material is taken into account during an MPS/MRP run? Is it simply defined by the scope of planning and then everything which has dependent requirements? Or is there another way to control? (I'd like to understand why the permanently stopped materials are still showing here).
kind regards & thank you very much!