Hello Guru,

one of our created production order has an error in Status saying : Error in cost calculation, when we check further the error it tell that ProdOrd 1 - No Price could be determine for subcontracting.

what is the cause for this? how could we resolve this? please help back. thanks

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    Posted on Dec 05, 2011 at 05:01 PM

    if you are using any non valuated material , this message will come for that material

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Özgen Canan

      Hello Guru,

      after we change the master data of the material master in MRP 2, field special procurement to 30. could we now change the production order, then do read pp master data to correct the issue? please advise,

      we have click the read PP master data after changing the material master, after we click it there is a pop up message telling results of the check, (error when checking bom, error when checking routings) the log contains messages.

      we click the log button, this is the below message:

      RED: Order 12345: purchase order already exist for operation

      RED: Order 12345: goods withdrawal carried out

      GREEN: BOM cannot be read for order 12345

      GREEN: Routing cannot be read for order 12345

      RED

      how can we proceed on this? please advise.

      Edited by: SAP_Totchiki on Dec 13, 2011 8:56 AM

  • Posted on Dec 05, 2011 at 07:03 AM

    Dear

    Please check the following

    1. Check the Standard value key in work center

    2. Check the T-code OP19 Std val. key

    3. Check the T-code OP54 in that indicator selections should be enable i mean to say once production order is raised it should fetch the details of work center so enable the work center for capacity requirements and also allowed for calculation and generate as well.

    5. if your work center settings is completely done then u check the cost in another new production order

    with regards

    pushpalas

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hello,

      Just read some thread that, if in KP26, with the cost center and activity type use in the ProdOrd is not maintained this kind of error exist? this the right cause for this? please confirm?

      Thanks

  • author's profile photo Former Member
    Former Member
    Posted on Dec 05, 2011 at 09:47 AM

    Hi,

    Please maintain Info Record with some some value Check and Revert.

    Regards,

    Mandar.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.