I have run CK40N for certain materials. Out of the materials included in the CK40N, one material was taken and I ran the CK11N for the material.
While comparing the results of the costing from both CK40N & CK11N, I find different cost results. Why this is happening so ?
kindly check the following....
>r u using the same costing variant in ck40n and ck11n.
>what is the timing difference between the two runs.
>analyse the line item which is having different cost.
Regards
Divraj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
thanks for the input. The difference in the costing results was due to authorization issues.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Check the following.
1. Is status of the Costing Run is same for both ?
2. Check the Cost of each Semi finished goods in each of the run
SB
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.