Hi Gurus,

I am getting -ve floats in some of the activities in project scheduling. How can i stop this?

Suresh Patel

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Best Answer
    Posted on Dec 03, 2011 at 09:13 AM

    Hi,

    Increase the finish date.

    Thanking you

    Vengaiah Chowdary

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 05, 2011 at 06:20 AM

    Hi Gurus,

    >

    > I am getting -ve floats in some of the activities in project scheduling. How can i stop this?

    >

    > Suresh Patel

    why you want to stop negative float, it is a standard behavior, and same concept is there in Project management as well?

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.