We have 3 blades in our Prod environment, 2 primary and one backup blade (shared). Our version of BIA is 7.0.60. We are planning to upgrade to BWA 7.20 and the plan is to upgrade the backup blade only first and connect to Q system for testing. Once tested and verified, upgrade other 2 primary production blades and add the backup blade back.
I saw this thread which talks about ubgrading one blade and connect to Q system:
BWA connection to several BW systems
Please advise,we need to follow same scenario for upgrading backup balde only first and connect to Q system.