Availability control is not working for WBS element inspite of avtivation of availability control.
Scenario:
Availabilty control check at 100% as error message.
In our case budget is exceeded 100%, even though system is not stoping the postings. Where as I copied same project with WBS elements and created new project and WBS elements, for this case system is checking the availability control as per control set in the system.
Note: Already Availability control is active for both projects.
Can any one help how this is not controlling for the above case
Regards,
Ram