Hi,
at the time of conversion of planned order to PR (MD14) i have changed the document type in planned order but system could not consider it and create the PR with the number ranges of standard document type (which is NB).
requirement is that system create PR with the number ranges of document type which i input or changed at planned order to PR conversion time (in MD14).
Regards,
Ali