Upgrade to 7.20

We are close to finishing the first pass at upgrading our R/3 6.4 SAP system to 7.20. However the restart of the T03 system has stopped at the MAIN_NEWBAS/STARTSAP_NBAS phase.

This is the error message.

Checks after phase MAIN_NEWBAS/STARTSAP_NBAS were negative!

Last error code set: RFC call to subst_get_uvers failed with key RFC_ERROR_COMMUNICATION (open): SAP_CMINIT3 : rc=20 > Connect to SAP gateway failed Connect_PM GWHOST=CSIAS9, GWSERV=sapgw15, SYSNR=15 LOCATION CPIC (TCP/IP) on local host with Unicode ERROR partner 'CSIAS9:3315' not reached TIME Sat Nov 26 22:12:45 2011 RELEASE 720 COMPONENT NI (network interface) VERSION 40 RC -10 MODULE nixxi.cpp LINE 2898 DETAIL NiPConnect: 165.156.101.209:3315 SYSTEM CALL connect ERRNO 79 ERRNO TEXT Connection refused COUNTER 270 System start failed

When we check the user profile T03OFR there is no kernel library in the library list. The job tried to start the R3_15 subsystem rather then the new SAP15T03 subsystem. We will need to apply a kernel to the T03 system to restart the upgrade.

Any thoughts if we should apply the the OLD kernel C64U0377 or the NEW kernel SAPT03IND

Thanks

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Nov 27, 2011 at 07:44 PM

    Hi Matt,

    sounds like you were missing parameters in the profiles ..

    Set in Start&Instance profile the following:

    DIR_CT_RUN = $(DIR_EXE_ROOT)/run

    DIR_EXECUTABLE = /usr/sap//SYS/exe/run

    Might it be possible, that the parameters above are not in both profiles right nów ?

    Regards

    Volker Gueldenpfennig, consolut international ag

    http://www.consolut.com http://www.4soi.de http://www.easymarketplace.de

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi Mathew,

      ERROR partner 'CSIAS9:3315' not reached

      I assume there is no issue with kernel since kernel switch has already happened. Only thing you need to check whether port 3315 is already occupied by some other process or not.

      you can look to /tmp/.sapstream3315 files . You can move them and start the sap system manually.

      Regards,

      Deepak Kori

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.