cancel
Showing results for 
Search instead for 
Did you mean: 

Cross Docking TO creation

Pranab
Participant
0 Kudos

Dear experts,

I am going for planned cross docking, I am able to successfully plan the documents (inbound and outbound deliveries) through LXDCK, but am not sure about what to do after this. After planing if post GR and go for TO creations it directs me for normal storage type instead of directing me to 916 (from 901). Pl let me know the sequence of steps after this. I have done all the necessary config as per my knowledge.

Pl reply on priority,

Thanks and regards,

Pranab.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Dear Pranab271

Did you found problem? Are you possible to create TO

I have similar problem during create TO (one step) for multiple Item packed in one H/U. Do you have the same problem?

Former Member
0 Kudos

Hi,

Planned cross docking enables two-step cross-docking, where goods to be cross-docked are first moved from the goods receipt (GR) area to a cross-docking storage type. The goods are subsequently moved to the goods issue (GI) area upon release of the outbound document. Hence after the system suggesting normal storage type, you need to transfer stock to cross docking area. Thanking you.