Hi all
We are Upgrading our SAP R/3 4.7 Ext200 SR1 nonunicode oracle 9.2.0.8 to ECC6 EHP5 Unicode 11.2.0.2.
But first we need to migrate our hardware.(i.e we are shifting the data from our old server to new server).
We will install R/3 4.7 on new sever with oracle 10.2.0.4 and restore database backup from old server oracle 9 to new server oracle 10 .Now i need to know apart from following activities what else i need to consider.
instance profile parameter (ST02). we will give the same parameter value to new servers instance profile
Background Jobs(db13) we will schedule same if DB SID is changed or if we give same DB SID than no need to schedule again
System logical name (BD54)
RFC connections (SM59)
se06,STMS
We have done all above in two testing Servers.
Kindly guide me if any other activity is required.
Kindly support
Gurbir Singh