cancel
Showing results for 
Search instead for 
Did you mean: 

Upload PRODUCTION live cache data to QUALITY live cache

Former Member
0 Kudos

Hi experts,

We have gotten a request for an estimate on how long time it will take to take data from SCP to SCQ.

It is data from the Livecache in production that is needed in quality livecache also.

We have a backup cube(ZFCST_BC) where we can take out the data in an OpenHUB.

And then we would probably need to use this file as a datasource and load it into a cube(maybe ZFCST_BC).

Is there an easier way to do this and how to approach to achieve above solution.

Regards

Venuscm

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Venuscm,

Are you talking about a subset of LC data, or are you talking about all LC data? If it is a subset, then exactly which data will be subject to this process?

Much LC data must be synchronized with table data. Attempting to load the wrong data in the wrong way will only result in a quality system that is un-usable.

The most reliable way to load Prod LC data into Qual is to follow SAP's recommendations, using 'System Copy'.

https://service.sap.com/sap/support/notes/886103

Best Regards,

DB49

Former Member
0 Kudos

Hi Dogboy49,

Thanks for the information.

We have backup cube called ZFCST_BC in SCM Production system and everyday we are taking backup based on DP Planning area, now this (ZFCST_BC) data i need to transfer ZFCST_BC in SCM Quality system everyday.

Please tell me the best approach based on my scenario.

regards

venuscm

Answers (0)