Hi all,

Is it possible to implement a release strategy using contracts.if yes can you explain me the steps to do it.

how many level of release codes do we have by defalut in system.as far i know are 8 but heard about 6 too.

Thanks

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Nov 23, 2011 at 07:29 AM

    Hi,

    Release strategy for contracts is very same as PO

    please use this link for entire guide

    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/8030038e-b2be-2e10-07bc-b7c61b397f09?QuickLink=index&overridelayout=true

    As per my knowledge SAP Standard only 8 level of release is possible . The number of release code that can be added in a release strategy is limited to 8 .

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 23, 2011 at 07:35 AM

    hi,

    in this the agreement type is importent for contract release startgy .

    same as p.o relase startgy.

    Thanking you.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 23, 2011 at 07:17 AM

    Hi,

    Release strategy for contract is same as that of PO where we use the same table as PO i.e CEKKO and create characteristic depending upon requirement regarding the limit of netprice etc..

    And as per my knowledge we can have upto 7 levels of release.

    Thanks

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 23, 2011 at 07:18 AM

    Hi,

    It is possible to implement release strategies for contract also.The same way as for PR's/PO/s.

    Under transaction OLME > contract > Release procedure for contracts - you can create here.

    And regarding the number of levels - you can define maximum of 8 levels of release strategy.

    In customising you only have eight possible entries because the system design dictates that

    as each step is released, on the database level the field EKKO-FRGZU

    is updated (for each step)

    I hope this helps.

    Regards,

    Ashwini.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.