Skip to Content
author's profile photo Former Member
Former Member

Storage type must Be Open type, relevant for MRP, not relevant for JIT call

Hi All

We have a Warehouse config requirement where Storage type must Be Open type, relevant for MRP, not relevant for JIT call.

Kindly tell me how to do this config.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Nov 23, 2011 at 02:33 PM

    Hi,

    MRP doesnot consider stock at WM level. So having storage type relevant for MRP is ruled out.

    What you can do is, exclude str location from MRP.

    Open the material master in change mode by giving input of plant & str location( which one to be exclude).

    In MRP4 view, select - Exclude str location from MRP run.

    When MRp run, system will not consider this str location.

    regards,

    Shetty

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 09, 2011 at 09:20 AM

    Issue done as MRP relevance and JIT call were satisfied

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.