Hi,
I have a strange phenomenon when running a package in data manager. Whenever I run a package, whichever one it is and irrespective of whether it fails or succeeds, I get a formula log (when the package succeeds a formula log 2) which shows me the result of a certain package run on 31.08.2011.
So, I run for example a currency conversion which succeeds. When I go to the details I have the PACKAGE LOG which contains the information I would expect about the package, start and run time etc.
I also have a formula log which contains more specific information about the currency conversion just run, again, as I would expect.
But I also get a formula log 2 which contains information about the legal consolidation package as it was run on 31.08.2011. This formula log 2 is always the same, whatever the package I actually did run, I always get info on a legal consolidation from 31.08.2011.
Has anyone one seen this before and would be able to tell me how to stop it?
Thanks,
Arnold