Bom Explosions

Former Member
0 Kudos

Hi Gurus.I have one prob.please solve this

I have noticed that the transactions CS11 and CS12 (and possibly some

other transactions) appear to round up the quantity for each material to

the next largest whole number. This can cause some problems when trying

to capture costs. There are times in BOMs that the quantity is a small

fraction, but will show up in the explosion as a whole number. Please tell me why SAP is behaving

like this? And if so, what is the business reason to round up the

quantities used? We would rather see the quantities reflected as the

actual quantity loaded in the BOM to eliminate the possibility of

improperly costing a material.

Accepted Solutions (1)

Accepted Solutions (1)

vasudevap_pushpalas
Active Contributor
0 Kudos

Dear

Use T-code CSMB Click on the settings for explosion display there u have CostingRelevncy select from drop down list and save then click on the start material browser

With Regards

Pushpalas

Former Member
0 Kudos

Hi pushpala.Thanx 4 ur reply..but i didnt understand what exactly happen wen we save the settings.

Ritz
Active Contributor
0 Kudos

Hi Basi,

as per my knowledge in CS11 it appears same as we maintained in BOM .

for example , 0.099 will appear same as 0.099 not 0.1

pls specify whats happening in your system.

Thanks

Ritesh

Former Member
0 Kudos

Hi pushpala..this is problem I am facing..wat is in the BOM that is not displaying in cs11 r cs12 for that material.Mite be it is happening because of rounding profile in sales tab 1 in material master but there also i got empty values.where i can see the settings?? please help me.

sjeevan
Active Contributor
0 Kudos

BOM supports up to 3 decimal places but the setting for that unit may be different (Data element KMPMG, Data type: MENGV13 Length 13, Decimals 3).

Go to Transaction Code : CUNI and go the the unit and change "Decimal pl. rounding" to 3.

Edited by: Jeevan Sagar on Nov 22, 2011 3:47 PM

Answers (3)

Answers (3)

Former Member
0 Kudos

I checked every thing.rounding profile is not maintained,unit of measure also 1=eash.but why system is behaving like this??we r maintaining reorder point is 1.maximum stock level also is 1.is this cause system behaving like this?

former_member186193
Active Contributor
0 Kudos

Hi,

Check two main things:

1. Check if any rounding profile is maintained

2. Is the unit of measure in material is same as in BOM. If not then check the conversion factor and maintain it properly.

Hope it will help you.

Regards,

Alok Tiwari

Former Member
0 Kudos

Hi Basi,

Well i been gone through your conversation with others by the way:

Did you check with the Rounding value in MRP views?

Did you check in Additional data the unit of measurement?

Did you check with Unit of Issue in work scheduling view?

Did you check with BOM item level conversion factors?

Please check and make sure they are OK.

Try it and please pop me back with issue OK.

Regards,

Madhu.G