Regarding Capacity Planning

Dear all,

please explain me about Capacity planning and give idea about configuration of CP...

thanks in advance for ur reply...

Regards,

Sathiya.

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Nov 22, 2011 at 12:00 PM

    Dear

    Can you please check the following basic set up :

    1.Materials Master define the Production scheduler and production scheduling profile

    2.Work Center - Define the capcity planner group,activate checkbox Relevant for Finite sceduling,on the capacity header define the shift timings,break timings and unit of measure,no of individual capaity, enter formula for scheduling in capacity view.

    3.Routing - enter the values for the standard values. Use control key with scheduling.

    4.In transaction OPU5 and OPU3Z - define the scheduling parameters for planned order and productiion orders and activate the checkbox Capacity requirement and Scheduling. what is the settings in OPPQ and OPPR for the "Start in Past" parameter, you need to keep them consistent with the OPU5 settings.Also in the order control OPJK I have maintained check capacity with SAPSFCG013 profile.

    5. Cheked in OPD0 and have the following set up

    Overall profile : SFAPSFC015 --Inside the over all profile I have the following set up

    1.Selection Profile -SAPSFCS013 SFC: Order view, standard overview

    2.Control Profile : SAP___C004 : Gen Capacity Availability Check for 1.5 months

    3.Time Profile : SAP___Z006 : Gen Capacity Availability Check for 1.5 months

    4.Evalution Profile : SAPSFCA013 : Gen Capacity Availability Chek =3.0D

    5.Strategy Profile : SAPSFCVER1-Gen Capacity availability Check

    6.Period Profile : SAP___P001 -Weekly period

    7.List Profile : SAPSFCI001-Production Planing

    This over all profile is aasinged to Producton Scheduling profile -OPKP.

    Refer :

    capacity planning

    http://help.sap.com/printdocu/core/print46c/en/data/pdf/PPCRPSFC/PPCRP_SFC.pdf

    capacity-planning

    capacity requirements planning

    Regards

    Ram

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Dear,

      Please check below link for complete cycle of Production cycle, to get good understand of pp process

      http://wiki.sdn.sap.com/wiki/display/ERPLO/CommonScenario%27sinDiscreteManufacturing

      Then you can check folloing points to concept on capacity planning.

      Capacity planning configuration

      1.Define formula parameter for work center :Formula parameters are used in formulas for capacity planning, scheduling, costing Transaction code :OP17

      2. Define forumla : tcode : OP21

      3; Assign capacity formula in capactiy tab of Work center

      4: prepare bom and rounting ( CS01& CS02)

      6; Assign factory calander in Work center (CR01), here u can allocate capacity of

      5; system will calculate capacity

      Regards,

      Ram

  • author's profile photo Former Member
    Former Member
    Posted on Nov 22, 2011 at 01:25 PM
    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 22, 2011 at 06:42 PM

    Hi Sathiya,

    Well the capacity planning in mainly used to find how to arrange the Order so that it can meet the customer at ontime delivery and aslo it checks the availability of machine, labour capacity to do the capacity evaluation and capacity leveling of the products to get manufacture.

    Well follow the attached link you will find need full information about Capacity planning.

    http://help.sap.com/saphelp_erp60_sp/helpdata/en/8a/a5a3154adc11d189740000e8322d00/frameset.htm

    I hope you will find needfull information any questions pop me again.

    Regards,

    Madhu.G

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.