Regarding Capacity Planning

Former Member
0 Kudos

Dear all,

please explain me about Capacity planning and give idea about configuration of CP...

thanks in advance for ur reply...

Regards,

Sathiya.

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi Sathiya,

Well the capacity planning in mainly used to find how to arrange the Order so that it can meet the customer at ontime delivery and aslo it checks the availability of machine, labour capacity to do the capacity evaluation and capacity leveling of the products to get manufacture.

Well follow the attached link you will find need full information about Capacity planning.

http://help.sap.com/saphelp_erp60_sp/helpdata/en/8a/a5a3154adc11d189740000e8322d00/frameset.htm

I hope you will find needfull information any questions pop me again.

Regards,

Madhu.G

Former Member
0 Kudos
Former Member
0 Kudos

Dear

Can you please check the following basic set up :

1.Materials Master define the Production scheduler and production scheduling profile

2.Work Center - Define the capcity planner group,activate checkbox Relevant for Finite sceduling,on the capacity header define the shift timings,break timings and unit of measure,no of individual capaity, enter formula for scheduling in capacity view.

3.Routing - enter the values for the standard values. Use control key with scheduling.

4.In transaction OPU5 and OPU3Z - define the scheduling parameters for planned order and productiion orders and activate the checkbox Capacity requirement and Scheduling. what is the settings in OPPQ and OPPR for the "Start in Past" parameter, you need to keep them consistent with the OPU5 settings.Also in the order control OPJK I have maintained check capacity with SAPSFCG013 profile.

5. Cheked in OPD0 and have the following set up

Overall profile : SFAPSFC015 --Inside the over all profile I have the following set up

1.Selection Profile -SAPSFCS013 SFC: Order view, standard overview

2.Control Profile : SAP___C004 : Gen Capacity Availability Check for 1.5 months

3.Time Profile : SAP___Z006 : Gen Capacity Availability Check for 1.5 months

4.Evalution Profile : SAPSFCA013 : Gen Capacity Availability Chek =3.0D

5.Strategy Profile : SAPSFCVER1-Gen Capacity availability Check

6.Period Profile : SAP___P001 -Weekly period

7.List Profile : SAPSFCI001-Production Planing

This over all profile is aasinged to Producton Scheduling profile -OPKP.

Refer :

http://help.sap.com/printdocu/core/print46c/en/data/pdf/PPCRPSFC/PPCRP_SFC.pdf

Regards

Ram

Former Member
0 Kudos

hi,

thanks .

can u please explain me from begining in detailed manner...

wat r all the things needed to implement capacity planning...

I m fresher to this PP module...

waiting for ur valuable reply...

Regards,

Sathiya.

Former Member
0 Kudos

Dear,

Please check below link for complete cycle of Production cycle, to get good understand of pp process

http://wiki.sdn.sap.com/wiki/display/ERPLO/CommonScenario%27sinDiscreteManufacturing

Then you can check folloing points to concept on capacity planning.

Capacity planning configuration

1.Define formula parameter for work center :Formula parameters are used in formulas for capacity planning, scheduling, costing Transaction code :OP17

2. Define forumla : tcode : OP21

3; Assign capacity formula in capactiy tab of Work center

4: prepare bom and rounting ( CS01& CS02)

6; Assign factory calander in Work center (CR01), here u can allocate capacity of

5; system will calculate capacity

Regards,

Ram