Hello Team,

My client has a requirement like in one screen he need to see what is the status of all the ECMS which are raised.

Do we have any standarad methodology for the same.

Regards,

Satish

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Nov 22, 2011 at 09:15 AM

    Try using CC07.

    Add a comment
    10|10000 characters needed characters exceeded

    • Hey friend thanks a lot, it was perfect, now only one small doubt, how can we pull or report the same to excel.

      In way for the same.------- I got it...thanks a lot, it was really helpfull tool

      Regards,

      Satish

      Edited by: satishss on Nov 22, 2011 3:58 PM

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.