Material revaluation and Detail project planning

Dear All,

I have a material with split valuation activated. Said material was revaluated using MR21. Whe it is done, we have to do it for a valuation type. Meaning, valuation type is mandatory.

Above material is tagged to a project when doing detail planning (CJ20N). But revaluated price is not picked. system considers the moving avarage price which is in the header level (That is the MAP which is entered initially before extending to the material to valuation types). Could you pls help me

either

to get the revaluated price with valuation types to project

or

Ignore the valuation type when revaluating the material by using MR21

Tks

Sujith

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Posted on Nov 22, 2011 at 07:54 AM

    Hi,

    Please check your valuation variant in network costing variant.

    Thanking you

    Vengaiah Chowdary

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 22, 2011 at 07:58 AM

    I doubt whether Master Data changes will influence the transaction data which took place earlier.

    May be you can remove and reassign the material again in the project.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.