Dear All,
I would like to upgrade ECC6 to EHP5 which is HA and run on windows 2008 R2 MSCS, MSSQL2008 on both prod and DR environment.
I don't see any problem upgrading HA based on the EHPI guide, however, i need some input on upgrading the DR.
As what i can think, during the upgrade, we'll first stop the log shipping to DR and perform EHP5 upgrade on PROD. Once EHP5 upgrade completed successfully on PROD, could we merely stop sql services and copy the datafiles + logs to DR and upgrade the Kernel from 7.00 to 7.20 since 7.20 kernel is downward compatible??
Your expert advise is very much appreciated.
Thanks,
Nicholas Chang.
Hi,
Since you need to stop logging during downtime phase. So, best way to do this is, after your production system will be upgraded to EHP5 level, upgrade kernel on the DR server and again restore the backup of your production system to DR server and start log shipping again.
Thanks
Sunny
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.