Scheduling agreement for tentative and firm delivery schedules

My client required 6 months tentative schedule and 14 days firm schedule for delivery. the same can be different for different customers. MRP type is PD, to meet this requirements, what configuration needed to be done ?

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Nov 21, 2011 at 12:55 PM

    Hi tapanpadhy

    1. Please Check The Scheduling Parameters In Production order

    --SPRO-IMG-Production-Shop Floor control-Operation-Scheduling

    2. Also Check the Floats Before and After Production Order Confirmation OPU3

    3. Even In material Master u need to define the Lead time Scheduling

    4. always use backward scheduling in order to meet the Requirement dates

    If u follow above this u can meet the customer requirement date

    Let me know if your problem is solved

    Regards

    Pradeep

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.