MRP RUN

Hi Gurus..

I have one scenario please explain me...

I have one plant and in that plant I have 500 materials.All r having PD as a MRP Type in MRP 1view.I have to do MRP RUN for only 5 materials in that plant.How to do that?

Regards,

Bhaskar.

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    Posted on Nov 21, 2011 at 11:42 AM

    Dear

    Use MD03 select the material and run

    also u can use mrp controller for that five materials and run mrp

    and system doesnt consider that material means please check the stock for that materials if stock is there MRP wont plan for that material

    With Regards

    Pushpalas

    Edited by: pushpalas on Nov 21, 2011 12:43 PM

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 22, 2011 at 03:25 AM

    Dear,

    MRP run affect only to those material for which a planning file entry is generated. E.G. If you receive a demand for a material then for that material a planning file entry will be generated. For the material whose no planning file entry exists then there will be no effect after MRP run.

    Regards,

    Alok Tiwari

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 21, 2011 at 11:27 AM

    Dear

    Out of 500 materials if you want to run only 5 materials, then you can use MD02 transaction one by one.

    else ,Run the MRP using MD01. you can create one common MRP controller for those 5 materials and assign it in MRP 1 view.

    Use the Enhancement M61X0001 and write the code , for this contact your ABAPer.

    so while running MRP in MD01 enter the created user exit key value .

    Find the below reference:

    http://www.sap-img.com/production/how-to-take-the-mrp-run-for-individual-mrp-controller.htm

    Regards

    Ganesh .M

    Edited by: Ganesh M on Nov 21, 2011 5:04 PM

    Add a comment
    10|10000 characters needed characters exceeded

    • dear Bhaskar,

      first, you need to check out your master data (materials). for example, are they flagged for deletion on plant or client level??

      if they flagged for deletion mrp mission is not possible...

      say, if you want them to be run look at 'MRP 1' view (run MM02 and fix just one which wasn't run, if okay then fix all others):

      1. what is the 'Plant-sp.matl ststus' ? it must be blank

      2. what is the 'MRP Type'? set it as 'PD'

      3. what is the 'MRP Controller'? it must be not blank

      4. goto 'MRP 2' view and check out the "Procurement type" set, for example, 'X'

      for F materials make sure you have valid inforecords..

      second , how do you run MD01 ?

      for example, try the following:

      scope of planning - blank

      set your plant

      procc key NETCH

      2

      3

      1

      1

      1

      today's day

      checkbox OFF

      checkbox OFF

      no user exit

      third,

      did you check out the MRP list? run MD06 for your plant (set the plant only and double hit Enter) - do you see the list of your materials?

      good luck!

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.