We are upgrading from 4.7 to ECC 6.0, our system landscape includes BI and APO. I would like to know the key activities to be done after upgrade and switch over the logical system connections and CIF interface. Anything else do we need to consider in data transfer due to Unicode version in ECC 6 ?

Checks to be done for both directions:

ECC 6.0 - SAP BI 7

ECC 6.0 - SAP APO

SAP BI - SAP APO

Thanks,

Bobby

Edited by: Bobby on Nov 19, 2011 1:16 PM

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Nov 19, 2011 at 01:31 PM

    Hi,

    Your question is not clear. Are you doing unicode conversion as well ?

    As far as testing is concerned, you need to do the integration testing with both BW and APO system. Check if all data load chains are successful.

    Thanks

    Sunny

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.