CK40N - Cost estimates with errors - Error message roll-up

Good morning,

i need to roll-up error messages from components to top-level codes.

Now if a component is costed with errors (status KF) it happens that its top-level code is costed without errors (status KA).

We lose time using CS15 to check components usage in order to re-calculate all top-level codes after the error correction.

In OKKN in tab Qty Struct. there is a checkbox to be flagged in order to roll-up error messages from components to top-level codes. It's called "Transfer Active Std Cost Est. if Mat. Costed w/Errors".

I selected the flag but the system works as before: no roll-up of error messages.

Does anybody have suggestions?

Thanks,

Regards

Enrico

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Nov 21, 2011 at 09:46 AM

    Hi Enrico,

    there should be a warning message in the higher-level cost estimate which says 'Cost estimate for material & contains errors -> Planned price'. It is message CK318. This message is a 'user-defined message' and the message type can be changed in t-code OPR4_CK. Please set the message type to 'Error'.

    In addition you must change the costing variant setting "Transfer Active Std Cost Est. if Mat. Costed w/Errors" to 'not active' (do not flag the checkbox).

    Then errors in costing will be rolled-up.

    Best regards,

    Johannes

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 18, 2011 at 04:33 PM

    Enrico, after set the flag, have you tried to run CK40N since the beginning again ?

    I meant since level Selection or try to create a new costing run.

    Sometimes even after setting the flag, system has already saved status before and you need to recreate the object.

    Regards

    Fred

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      I tried through CK11N, too.

      I think that the system behaviour should be the same than CK40N.

      But no error messages roll-up.

      Shall i open an OSS NOTE? Or maybe please you have something more to suggest?

      Thanks,

      Regards

  • author's profile photo Former Member
    Former Member
    Posted on Nov 21, 2011 at 09:33 AM

    Hi,

    There seems to be some problem with your system , as standard SAP behaviour is that , if a component is costed with error , higher level material also get KF status . i have experience this feature on my project .

    If you check F1 documentation of field , "Trasfer act std cost if mat costed with error" ., the same have been mentioned.

    If you activate , this check box , then system will automcatically transfer existing std cost , if they it receive KF status in costing run.

    therefore , you should remove this check box from costing variant , and still higher material does not get KF status , search for any oss notes or raise a message .

    rajesh

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Please, could you tell me something more about the system behaviour?

      In other words, i'd like to know if error messages are rolled-up wuth the same error code instead of through another generic code.

      I searched for notes nut i didn't find anything. Probably, i'll be forced to open a new message to SAP.

      Thanks,

      Regards

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.