hi all,

can any one plz tell the best testing techniques for testing the reports that we have migrated from boxi r2 to bi 4.0.

thanks in advance.

-sheetal

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Nov 18, 2011 at 09:47 AM

    Hi,

    during a migration of Reports i always check the following

    1. Runtime

    - Is it identical to the prior version? Maybe slower, Maybe faster?

    2. Data

    - Is the Aggregation bringing up the same values as before? Like SUM, AVG, etc.

    - Are the values still the same and make them sense? This should check your Customer department

    3. Layout

    - Is the Report still looking the same as before?

    Part 3 could be tricky cause with BI4 we introduce a totally new Chart Engine.

    Regards

    -Seb.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.