why is there a difference in the SLED of batch in LX02 report and MSC3N.
Transfer posting (mvt typ 309) has been done for the concerned batch A to B (storage locn changed).
Batch A has SLED in MSC3N as say 1
Batch B has SLED in MSC3N as say 2
Btach A is not showing in LX02 report, only batch B is showing in LX02 report with a SLED 1(for batch A).
Is this is a bug in LX02 report. Please guide, any help/information is appreciated.