Issue - automatic release block in MRBR for planned costs (tol KW/PP)

Tolerance key KW is defined for planned costs. The tolerance is correctly selected in MIRO and invoices are blocked appropriately; there is no issue in MIRO.

The block for planned costs is indicated as a price variance in MRBR and the condition is listed. When MRBR is executed in 'Release Automatically' mode, system checks the tolerances defined under tolerance key PP rather than KW. MRM_TOLERANCE_CHECK is called for tolerance key PP.

Because the tolerance amount for tolerance key PP is checked rather than tolerance key KW (planned costs), invoices are released erroneously. The tolerance for KW should be checked instead.

Has anyone encountered this issue? If so, what action did you take?

Thank you in advance.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Nov 17, 2011 at 04:07 AM

    Hi

    At transaction code OMR6 maintain same values of KW to PP as well.

    Srinivas

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.