I have a fert having stockable product, MM post 100 tons to storage location.

i have 10 sales order and among them i have created 5 outbond delivery of total qty 40tons.

at schedule line level i have remove the availability check so now its check the availability at outbond delivery level.

now i am creating an outbond delivery with ref to order system prompt me with the warning that only 10 tons of material are available. ????

i have run the mmbe report which shows the 100 tons qty and "schedule for delivery" of 40 tons.

no pgi done of any single delivery so far.

Looking for the gurus experience in this regard as problem is very critical by nature.