Hi Consultants

I have a vendor assigned to an equipment in partner assignment and i need the following

1. have the vendor populated in the service PR (PM03 Key) created for the equipment after maintenance order creation.

2. can the vendor changes for that equipment be tracked (for eg. i have a crane and assigned the OEM as a vendor and if point 1 is achieved i have the OEM gets defaulted in the vendor for the PR) If i make changes to the vendor assigned in the equipment say i replace the OEM with a local vendor i should be able to track the changes in the equipment master

Is there any other functionality to achieve this in Equipment master which is in AMC

The client is outsourcing the entire utility maintenance like A/C installations, Electricity etc.. any BPP link for this scenario will be helpful