Skip to Content
author's profile photo Former Member
Former Member

skip lot

CAn anybody explain me how can I achieve skip lot methodology in an inspection process.

Please tell me as Master data related data and config related data..

please help me out.

karthick P

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Nov 09, 2011 at 07:04 PM

    To skipping lot from inspection first you need to set "SKIP" checkbox with referance to inspection type in material master. Then you need to create DMR with skip rule and you need to attach this DMR rule to inspection plan either at MIC or header level.

    To learn more aout this topic read following thread and let us know if any more question.

    [skip-lots]

    [skip-inspection-lots]

    [http://help.sap.com/saphelp_erp60_sp/helpdata/en/3c/929d11db7d11d283cb0000e829fdb3/frameset.htm]

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.